Skip to content
Transparent Costing & Scope Breakdown

Fair Rates Based on Real Technical Scope

We charge for the real hours it takes to draft, coordinate, and clear your permit—never arbitrary percentages or low-ball flat-rate teasers.

Canadian Blueprint Inc. Logo
Canadian Blueprint Inc. ASTTBC Registered Practice Full E&O & Liability Insured
Our Commitment

Permitted, Not Just Drawn: Free Upfront Feasibility

Our costing is directly tied to our upfront feasibility analysis—which is why we provide feasibility reviews 100% free of charge. We don't want you spending a single dollar on drawings if local zoning bylaws block your build or if mandatory building code upgrades will exceed your construction budget. Once feasibility is confirmed, we sign a detailed multi-page contract locking in a guaranteed fixed project fee with included municipal revisions.

Service Costing Guides

Select your project category below to understand the exact technical scope and drafting hours involved.

Residential Renovation Permit Cost
Renovation

Residential Renovations & Additions

From simple condo partition moves to complex multi-level home additions and unauthorized work legalizations. Understand what shapes residential drafting hours.

  • Lowest tier for simple condo alterations
  • Record Drawings vs. LiDAR As-Built scans
  • Unauthorized work audit & risk prevention
  • Townhome Part 9 vs. Part 3 Architect rules
Track Record: Fixed fee locked after feasibility review
Explore Renovation Costs
Commercial TI Permit Cost
Commercial

Commercial Tenant Improvements

Save thousands by designing Part 9 commercial spaces directly with certified professionals without unnecessary architectural retainers.

  • Part 9 vs. Part 3 Architect threshold review
  • Occupancy classification & change of use math
  • Egress travel distances & universal accessibility
  • Reflected Ceiling Plans (RCP) & engineering schedules
Track Record: Clear municipal review without costly delays
Explore Commercial TI Costs
New Build Permit Cost
New Build

New Custom Homes & Infill Multiplexes

Ground-up design priced on lot topography, municipal bylaws, and structural scope—not inflated percentages of your construction budget.

  • Flat lot baselines vs. hillside civil grading
  • SSMUH 3–6 unit multiplex fire & acoustic detailing
  • BC Zero Carbon Step Code & Energy Advisor integration
  • Preliminary design iterations included under scope
Track Record: Permit-ready sets aligned with 2024 BC Code
Explore New Build Costs
LiDAR As-Built Measuring Cost
General

LiDAR As-Built Site Measuring

A transparent $0.30/sq ft baseline for millimeter-accurate CAD floor plans and 360° virtual site baseline records.

  • $0.30/sq ft baseline (AutoCAD .dwg + 360° Tour)
  • $300 base minimum for condos & small units
  • Sliding-scale volume discounts for 5,000+ sq ft
  • Don't Pay Twice: Free check for legal archive drawings
Track Record: Millimeter-precision laser capture across BC
Explore As-Built Rates
Interior Elevations & 3D Rendering Cost
General

Interior Elevations & 3D Renderings

Understand what City Hall requires for building permits vs. why custom interior millwork elevations and 3D renders drive drafting hours.

  • 4 exterior facades vs. 50–300 interior wall planes
  • Basic 3D BIM model included in all new builds
  • Commercial 3D shells for complex plenums
  • When to hire an Interior Designer vs. Permit Drafter
Track Record: Fixed-hours pricing for custom interior scope
Explore 3D & Elevation Costs

Why Our Costing Model Protects Your Project

Clear milestones, zero change-order traps, and total legal accountability from initial sketch to final municipal permit approval.

Signed Written Contract

Before any deposit is paid, both parties sign a detailed multi-page agreement stipulating every drawing sheet, full scope of work, technical observations, and delivery timelines. We stand 100% behind our quote.

50/50 Milestone Structure

50% deposit to initiate design, and 50% upon completion of permit-ready drawings. Because city halls can take months to review files, your balance is tied to our delivery—not municipal processing backlogs.

City Revisions Included

Plan checker deficiency requests, structural engineering notes, and design refinements under the original scope of work are 100% covered in your base quote with zero extra fees.

Fair Scope Adjustments

If city records flag an unrecorded historical deck or addition not in original scope, you only pay for the specific new sheets needed. You never restart from square one since your base model is already built.

Municipal Hall Costs

Want to Know What Your City Charges in Permit Fees?

Municipal permit application fees, damage deposits, and trade charges are set directly by your local city hall and vary widely across British Columbia. Explore our City Resource Hub to find fee schedules, online application portals, and GIS mapping tools for your exact municipality.